
EPG was awarded with “popular item of Zhejiang Province” and “popular manufacturer of Zhejiang Province”. Owing to our sincerity in offering ideal support to our consumers, understanding of your wants and overriding perception of responsibility towards filling purchasing needs, Our AdvantagesProducts Massive volume in Inventory, No MOQ necessary We comply with all the worldwide requirements, this sort of as ISO9001 and TS16949 specifications.
The EPT motor of PGF hi-velocity knitting EPTT is applied with the technique of frequency conversion, which makes it possible for the stepless speed manage even for the duration of the procedure, for case in point: while the feeding breaks (finishes), the EPTT is instantly stopped although the vehicle feeding unit is utilised for knitting core fabirc, for equally thick or slender main materials inside the limit, the shipping and delivery is uniform the EPTT is also stopped instantly although core breaking(ending) to stay away from degrated product. And the braided cloth that is created with PGF hello-speed knitting EPTT is of higher qualify and much more trustworthy.
II, Reasons AND Content OF KNITTING
PGF hello-pace knitting EPTT is capable to knit curtain belt, shoe belt, cummerbund of the designs of column, pipe, and flat, and pipe-shape jacket, and so on.
Different varieties of content are adoptable for PGF hello-velocity knitting EPTT, this kind of as cotton yarn, chemical fibre yarn, silk, soft steel wire, and so on.
III, Functions
PGF hello-speed knitting EPTT is of the shut framework, hassle-free for procedure, extremely automatic, quick for adjustment, reputable for procedure, of decrease sounds, of increased performance, of EPT quality and so on.
IV, Operation Techniques
Just before commencing the EPTT, shall verify the following items:
one whether the EPTT stress is proper
two whether the earth unit is reliable
three whether the motor steering is right
four thoroughly clean up the table, and other obstructions that influence the operation of the EPTT
five regardless of whether the EPTT oil is experienced (oil model, oil volume)
As soon as the above items are checked and handed, adhere to up the underneath processes to start off the EPTT:
one hook up the EPTT (EPTT two stage 380v)
2 shift the swap of EPT box to the level of quotON quot(the EPTT source indicator is on, which means it is EPTTed)
3 push the start button
4 switch the rotating-set up button clockwise
5 refer to the manual of frequency conversion EPTT to operation the EPTT.
V, Treatment method FOR YARN-BREAEPT (FEPTSHING)
If the yarn breaks(finishes) even though the EPTT is operating, the breaking indicator is on. Check every single yarn cop. If the yarn is damaged, pull the end of that yarn toward the completed knitting, and then press the startup button if the yarn cop is vacant, get off that a single, and substitute it and thread the yarn and pull the conclude of yarn in the direction of the concluded knitting, and then push the startup button. If the main is broken, examine the core unEPTTthe EPTT entire body, and pull the finish of the main in direction of the concluded a single, and then push the button to knit.
VI, ADJUSTMENT OF Certain Speed
To change the speed of the top still left EPT on the cEPTTr column can get distinct pace of sure, and distinct sheer-form cross factors of every single size in mm (or named as merchandise density, merchandise no.)
Refer to the beneath chart and desk one for particulars
DIAGRAM OF Equipment
Distinction table in between the sure speed of hello-pace knitting EPTT and EPT EPTTble one
(from the left to the correct)
Frequency of motor: 60HzZB=30ZC=28
ZA pace of certain CM/min number of sheer-shape cross stage/CM
Frequency of motor: 60HzZB=30ZC=36
ZA pace of certain CM/min amount of sheer-shape cross level/CM
Frequency of motor: 60HzZB=30ZC=38
ZA velocity of sure CM/min variety of sheer-condition cross position/CM
Observe: Whilst the frequency of motor is not 60HZ, the velocity of sure is that the worth in the earlier mentioned table moments the genuine operate frequency/60, and the sheer-shape cross point is not altered.
VII, Servicing INTRODUCTION
For the EPTT that is currently being utilized, should lubricate its lead, spline ingot groove, and the lubrication volume can not spill in excess of, and it is best to lubricate it just staying away from dry-managing. Have to incorporate oil on the concave ring of spline shaft, at lEPT two instances for each eigEPTT hours, several drops for each time.
The oil that is largely utilized on the spline EPT box need to be replaced completely following 1 month, and then, is to be supplemEPTTd in accordance to oil scale quantity. Throughout the manufacturing, make a decision whether to exchange lubrication (the lubrication utilised on the EPTT is 32#) according to the oil standing. Shall thoroughly clean up the float on any components often (do not do it while the EPTT is working).
VIII, Safeguards for Installation and Assembly amp Unassembled
Installation: must put the EPTT on the rigid floor, and should hold it in amount soon after while setting up the rear table board.
Hanging Set up: if this EPTT is moved soon after dis-packaged, whether or not for forklift or crane, the stage of power shall alwaEPTTbe set on the decrease crosspiece unEPTTthe holEPTTof the quadrate pipe EPTT, have to not on the desk board of the knitting EPTT.
EPTTAL Element
| Hi-pace sealing knitting EPTT | Procedure handbook | Overall eleven web pages | ||||||||||||||||||||||||||||||
| Website page 6 | ||||||||||||||||||||||||||||||||
seven.two typical faults and resolution approaches for frequency conversion EPTT in below table
|
||||||||||||||||||||||||||||||||
| Hi-velocity sealing knitting EPTT | Procedure manual | Overall 11 web pages | |||||||||||||||||||||||||||||||||
| Webpage seven | |||||||||||||||||||||||||||||||||||
continued
|
|||||||||||||||||||||||||||||||||||
| Hi-pace sealing knitting EPTT | Procedure guide | Whole eleven pages |
| Website page eight | ||
| VIII, Crucial perform, perform exhibit, operation introduction of HLPC 0D7523A EPTT operation EPTT 8.one important perform of HLPC 0D7523A EPTT procedure EPTT one PROG programming/purpose display key |
||
| Hi-velocity sealing knitting EPTT | Operation manual | Overall eleven web pages |
| Webpage 9 | ||
eight.2 Clarification of operate exhibit objects
|
||
| Hi-velocity sealing knitting EPTT | Operation guide | Whole 11 web pages |
| Page 10 | ||
| eight.three Clarification of keyboard
EPTT on #8594 show F00.(push PROG) #8594display FOR or REV (press PROG) #8594 existing C000 (the purpose code selection interface can make use of #9661 #9651keEPTTto adjust the flash digit number, the very last digit flashes) #8594 (push EPTTR) present C000 (The 1st digit flashes) #8594 (push EPTTR) current C000 (The 1st digit flashes) #8594 (push EPTTR) current C000, the last digit flashes. Case in point: c111 is established as two, as subsequent
|
||
| Hi-speed sealing knitting EPTT | Operation guide | Whole eleven web pages |
| Page eleven | ||
| VIII, EPT Diagram (see attachment)
VV, Thorough EXPLAINATION OF FREQUENCY CONVERSION EPTT |
||
| I. EPTT Introduction The high-pace braiding EPTT employs a sort of EPTT and novel layout. 4 16-spindle braiding EPTTs are integrated into a single unity. By making use of the VFD-A sort alternating present motor EPTr that is produced by means of combining the personal computer handle EPT, the centralized frequency-change and stepless speed regulation can be understood. The EPTT is provided with many varieties of automatic protective features such as: automated quit even though the line breaks, more than torque, above voltage, unEPTTvoltage, overheating, above load and so on. The EPTT also has a variety of outstXiHu (West EPT) Dis.Hu (West EPT) Dis. benefits, for instance: large rotate velocity, high production performance, modest ground spot, lower sound, EPTT service life and easy procedure as properly as power conserving. It is the upgrading and new generation merchandise of traditional disc braiding EPTT. II. Fundamental EPTnical Parameters Rated EPTT of motor: 075W Rated velocity of motor: 1390r/min Number of spindle: 16*4 960*790*seven-hundred(L*B*H) 24*2 1240*620*seven-hundred(L*B*H) Specification of quill:( Phi48*one hundred sixty)mm Spindle velocity: 350r/min Strategy of velocity adjustment: frequency-adjust and stepless pace regulation III. Services Situations Voltage of EPTT provide: AC220V plusmn10%HUO or AC380V plusmn10% Frequency of EPTT provide: 50HZ plusmn5% Ambient temperature: -ten ordmC-forty ordmC(no condensation and no freeze) Ambient humidity: unEPTT90%RH(no condensation) Functioning surroundings: no drinking water droplets, steam, dust and grease stain no putridity, flammable fuel and liquid no drifting dust and steel particle reliable foundation, no serious vibration no interruption of electromagnetic sound. IV. Installation 4.1The products fixture base are not needed for the installation of this EPTT. Only place the EPTT on the solid and even concrete ground and preserve level with out vibration. four.2 Configuration of EPTT EPT 4.2.1 According to the buyer demand from customers, the EPTT might provide large velocity braiding EPTTs that are used to two types of voltage stages: 220V, 50HZ and 380V, 50HZ. The consumer shall hook up strains properly according to the relevant voltage level of purchased equipment. Be positive no wrong relationship so as to steer clear of that the EPTT cannot work generally or any injury transpires. four.two.two When person disposes the EPTT source of higher speed braiding EPTT, please EPTTly care whether there is a reputable ground line in the electrical energy grid (SV220VAC380V)system (i.e. No matter whether there is reliable grounding for socket grounded phase of EPTT source AC220V or AV380V). If not, an additional protective floor line for the EPTT ought to be produced. Its foundation resistance shall not be in excess of 4 Omega. And then merge it into the grounded stage of EPTT socket (SV220V or AC380V) or inducted to the grounding end of the EPTT right. |
| 4.2.3 The EPTT line relationship of the EPTT is previously carried out for consumers. The grounded stage of EPTT source plug is rightly connected with grounding end of the EPTT. The user just wants to insert the EPTT supply plug into the EPTT source socket that is prepared according to appropriate voltage level to link the existing. 4.3 In the case of not connecting the existing, open up the doorway of EPT management box with the presented key to verify whether or not electric powered elements in EPT control box are broken or loosening. If the connecting line is loosening, related measures ought to be carried out in time. 5.one No-load Check five.one.one Change on the EPTT supply of EPT management box 5.1.2 Flip on the swap of EPTT provide within the EPT manage box. If the indicating lamp of EPTT supply on the manage panel and pertinent indicating lamp on EPTT operator panel of frequency changer illuminate, it is indicated that almost everything is rigEPTT and no-load take a look at can be operated. five.1.three Change the pace-regulating potentiometer of frequency setting knob on the EPT manage box panel again to the scale fifty(anti-clockwise rotation). Instantaneously push the button to make the EPTT to rotate instantaneously and watch regardless of whether it is rotating clockwise or not. If not, exchange the positions of U and V of output port of frequency changer. Watch and make certain that the all operating is fleXiHu (West EPT) Dis.ble and smooth to guarantee no obstacles and abnormal clash. If anything incorrect transpires, pertinent motives must be located in orEPTTto resolve the issue. five.1.4 Push the startup button on handle panel, then progressively increase the controlling force of alternating motor EPTr (i.e. gradually rotate the potentiometer knob clockwise) at the same time, view and make certain that the speeds of motor and rotation board are rising gradually and that the managing is typical. five.one.5 Press the end button on manage panel and observe regardless of whether the motor is synchronized with the instruction. If not, the explanation shall be discovered in orEPTTto eradicate the fault. five.two Load Examination 5.2.one Soon after no-load take a look at is finished, the load examination can be operated. Location the braiding spindle into the desktop XiHu (West EPT) Dis.Hu (West EPT) Dis.. Equip the braiding spindle with the needed specified quill with the essential colour yarn in accordance to the extravagant yarns that will be weaved and get every thing ready. five.two.2 Swap the speed-regulating potentiometer knob on the EPT management box panel again to the scale , instantaneously press the button to change on motor and make it rotate. View that the running of quill has impediment or clash. If some thing wrong transpires, the purpose shall be discovered in orEPTTto get rid of the fault. five.2.3 Thrust the startup button and change the velocity-regulating potentiometer knob. Make the motor to maintain managing for a even though(five~10min)in the velocity of 1000r/min. If every little thing is proper, lower off 1 yarn by manual. If the motor is turned off at after, it is proved that automatic quit protecting gadget is sensitive. So, the EPTT take a look at is completed entirely. The EPTT can be set into the regular generation. VI. Specific Notices In orEPTTto ensure the securities of folks and products and receive the very best services result, we would like to particularly rXiHu (West EPT) Dis.Hu (West EPT) Dis.d all of users that adhering to cases should be paid out a lot more attentions even though setting up this EPTT. |
| 6.1 The workshop with the installation of this EPTT should have very good floor wire with floor resistance of less than four
six.2 This EPTT must be grounded independently it shall not be jointly grounded with substantial electric-current EPTTs, this kind of as electric powered welding EPTT and higher-EPTT electric powered motor. The EPTal region of ground line must be equal or a lot more than 4mmtwo.
six.4 When frequency changer outputting, in output side principal circuit, alternating existing making contact with location is not allowed offering and breaking EPTT source. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| EPT-speed Braiding EPTT | Instruction | Overall internet pages | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| No. Web page | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

